| 2026-06-29 Order | SPYDER Short-Medium Distributed Defense Rafael announced that Romania selected SPYDER and that an initial order had been signed in the prior week; the exact signing date was not disclosed | Romania / Ministry of National Defense | Rafael / ELTA Systems | Rafael announcement dated 2026-06-29: Romania selected SPYDER and an initial order was signed in the prior week; the exact signing date is unpublished - Units
- Large number of batteries; not quantified in the manufacturer release reviewed
- Interceptors
- Quantities not published in the manufacturer release reviewed
- Radar / fire control
- Quantities not published in the manufacturer release reviewed
| Rafael announcement date: 2026-06-29. Expected within 36 months of an undisclosed prior-week signing date | A new large European/NATO demand line; the manufacturer release does not establish an annual production-rate commitment. |
| 2026-06-22 Delivery | IRIS-T SLM Short-Medium Distributed Defense Diehl announced the handover of the first IRIS-T SLM fire unit to the Estonian Air Force at Ämari Air Base | Estonia / Estonian Air Force | Diehl Defence | Diehl announced handover of the first IRIS-T SLM fire unit to the Estonian Air Force - Units
- First fire unit
- Interceptors
- Quantity not published in the manufacturer release reviewed
- Radar / fire control
- One fire unit includes launcher, radar, and tactical operations centre; quantity not published
| Delivered 2026-06-22; no follow-on window stated | A dated Baltic ESSI order-to-handover milestone, not a quoted annual production-rate commitment. |
| 2026-04-30 Delivery | Barak MX Area Defense Backbone IAI announced that Israel MOD/SIBAT and IAI delivered Barak MX to the Slovak Air Force; the first battery was being brought into operation, full readiness was then expected in following weeks, and additional components were expected through 2026 | Slovakia / Slovak Air Force | Israel Aerospace Industries / Israel MOD | IAI announced delivery of Barak MX to the Slovak Air Force under the 2024 agreement - Units
- First battery; total battery count not normalized in the official release reviewed
- Interceptors
- Quantities not published in the official release reviewed
- Radar / fire control
- Quantities not published in the official release reviewed
| First battery announced 2026-04-30; additional components through 2026; full readiness then expected in coming weeks | Advances the Slovak record from acquisition to observable delivery and readiness activity; it does not establish service entry or full operational capability. |
| 2026-01-29 Production | THAAD Upper-Tier BMD Lockheed and the U.S. Department of War announced a framework to raise THAAD interceptor production capacity from 96 to 400 per year; no delivery tranche or award date was stated | United States | Lockheed Martin / Missile Defense Agency | Framework agreement to expand THAAD interceptor output - Units
- No battery or launcher quantity published in the linked source reviewed
- Interceptors
- 96 to 400 THAAD interceptors per year over the next seven years (framework capacity target)
- Radar / fire control
- No radar increment described in linked source reviewed
| Framework capacity target announced January 2026; no delivery tranche or award date published | Lockheed describes a framework capacity target to expand THAAD interceptor production from 96 to 400 per year over seven years. |
| 2025-09-02 Testing | SPYDER Short-Medium Distributed Defense Czech Army said the first SPYDER battery passed an operational test and entered military trials ahead of fielding | Czech Republic | Rafael / ELTA Systems | First SPYDER battery moved into military trials ahead of Czech fielding - Units
- First battery
- Interceptors
- SPYDER-family interceptor mix varies by customer configuration; the linked source does not restate missile quantities
- Radar / fire control
- Battery-level sensor package under test; exact radar configuration is not restated in the linked source reviewed
| First battery entered trials in September 2025; fielding remains ahead | Provides a dated first-battery testing milestone in the Czech fielding path for an export-reference system. |
| 2025-04-28 Operational use | SPYDER Short-Medium Distributed Defense Armed Forces of the Philippines said the Philippine Air Force Spyder Air Defense System was used during Balikatan 40-2025 integrated air and missile defense exercise | Philippines | Rafael / ELTA Systems | Philippine Air Force used the SPYDER Air Defense System during Balikatan 40-2025 integrated air and missile defense exercise activity - Units
- Deployed unit count not published in linked source reviewed
- Interceptors
- SPYDER-family interceptor mix varies by customer configuration; the linked source does not restate missile quantities
- Radar / fire control
- Operational-use report does not restate the deployed radar configuration
| Operational-use reference recorded in April 2025; procurement and delivery timing are tracked separately in the archive | Adds a dated operational-use anchor for SPYDER, separate from the archive’s Czech delivery and testing milestone. |
| 2025-01-16 Production | Iron Dome Point Defense Israel MOD signed first U.S.-aid-funded procurement contract with Rafael to expand Iron Dome interceptor production | Israel | Rafael / Israel MOD | U.S.-aid-funded contract to expand Iron Dome interceptor output - Units
- Contract scope not normalized into batteries or launcher counts
- Interceptors
- Tamir interceptors
- Radar / fire control
- Not separately stated in linked source reviewed
| Not published in linked source reviewed | Israel MOD explicitly states serial production expansion. |
| 2024-12-24 Production | Arrow 3 Upper-Tier BMD Israel MOD and IAI signed major deal to expand Arrow 3 interceptor procurement | Israel | Israel Aerospace Industries / Israel MOD | Arrow 3 interceptor procurement expansion - Units
- Interceptor quantities not published in linked source reviewed
- Interceptors
- Arrow 3 interceptors
- Radar / fire control
- No radar increment described in linked source reviewed
| Not published in linked source reviewed | Official release explicitly frames this as expanded Arrow 3 interceptor procurement pressure. |
| 2024-12-23 Order | Barak MX Area Defense Backbone Israel MOD announced a landmark 560 million euro agreement to sell Barak MX to Slovakia | Slovakia | Israel Aerospace Industries / Israel MOD | Landmark Barak MX agreement for Slovakia covering radars, interceptors, and related system equipment - Units
- Exact battery count not normalized in the official release reviewed
- Interceptors
- Barak MR / LR / ER mix not separated in the official release reviewed
- Radar / fire control
- IAI / ELTA radar package; exact sensor selection not published in the official release reviewed
| Implementation active; exact delivery tranches not published in the official release reviewed | Establishes the Slovak acquisition baseline; delivery is tracked separately. |
| 2023-11-30 Order | IRIS-T SLM Short-Medium Distributed Defense Latvia signed an order for IRIS-T SLM for approximately EUR 600 million; the manufacturer forecast deliveries from 2026 | Latvia | Diehl Defence | IRIS-T SLM order for Latvian air-defense buildout - Units
- System quantity not normalized in linked source reviewed
- Interceptors
- IRIS-T SLM missiles
- Radar / fire control
- TRML-4D family in published system architecture
| Not published in linked source reviewed | European demand extending beyond the Ukraine emergency channel. |
| 2023-11-12 Order | David's Sling Mid-Tier Bridge Layer Israel MOD announced an agreement signed for Finnish procurement and implementation | Finland | Rafael / RTX / Israel MOD | Finnish David's Sling procurement agreement - Units
- Public source reviewed does not normalize battery count
- Interceptors
- Stunner / SkyCeptor family
- Radar / fire control
- AESA multi-mission radar package
| Implementation active; exact delivery window not published in linked source reviewed | First export implementation beyond Israel creates a new demand line. |
| 2023-11-07 Order | Sky Sabre Short-Medium Distributed Defense MBDA and PGZ signed Narew agreement covering 100+ launchers and 1,000+ CAMM-ER missiles | Poland | MBDA / PGZ | Narew agreement expands Poland's CAMM-family land-defense package - Units
- 100+ launchers
- Interceptors
- 1,000+ CAMM-ER missiles
- Radar / fire control
- Not normalized in linked release
| Program execution underway; exact per-batch window not published in linked release | Large launcher and missile volumes indicate durable serial demand in Europe. |
| 2021-12-06 Service entry | Sky Sabre Short-Medium Distributed Defense UK Ministry of Defence said 16 Regiment was accepting the first Sky Sabre tranche into service | United Kingdom | MBDA UK / Saab | UK MoD said 16 Regiment was accepting the first Sky Sabre tranche into service - Units
- First tranche; exact battery count not published in linked source reviewed
- Interceptors
- CAMM
- Radar / fire control
- Saab Giraffe AMB 3D radar in UK Sky Sabre configuration
| UK MoD statement published 6 December 2021; it described the first tranche as being accepted into service | Provides a dated service-entry reference for the CAMM-family path alongside later procurement demand. |